DIAR 44C

The project consists of a ground floor and 3 floors, and the floor consists of only two units and a garage.The project has a modern frontage with weather changes resistant paints,entrances and covered with the mot luxurious types of marble and granite.

DIAR 44C
Last updated : 2021-03-28
Region : New Cairo
Project Status : Current Project

Facilities

Insulation Insulation
Entrance Entrance
Elevator Elevator
Garage Garage
Aluminum isolation Aluminum isolation
Central Satellite Central Satellite
Conditioner Bracket Conditioner Bracket
Connection Feed & Drain Connection Feed & Drain
Storage Room Storage Room
Electronic gate Electronic gate
Visual Intercom Visual Intercom
CCTV System CCTV System
Show More

Finishing Garage’s Floor Andalus 21

12 February 2020

Step by Step finishing garage’s floor (Helicopter) Andalus (21) 5th settlement

Share Url

More Videos