Diar 194C

The project consists of ground floor,3floors and only 2 units in every floor. The project is distinguished by its modern frontage using weather changes resistant paintings, entrance is covered the most luxurious marble and granite.

Diar 194C
Last updated : 2023-02-06
Region : New Cairo
Project Status : Current Project

Facilities

Insulation Insulation
Entrance Entrance
Elevator Elevator
Garage Garage
Aluminum isolation Aluminum isolation
Central Satellite Central Satellite
Conditioner Bracket Conditioner Bracket
Connection Feed & Drain Connection Feed & Drain
Storage Room Storage Room
Electronic gate Electronic gate
Visual Intercom Visual Intercom
CCTV System CCTV System
Show More

First Floor Works Andalus 505

11 February 2020

Step by Step | Starting on the roof of the first floor works - Andalus (505) - 5th settlement.

Share Url

More Videos