Diar 203A

The project consists of ground floor,3floors and only 2 units in every floor. The project is distinguished by its modern frontage using weather changes resistant paintings, entrance is covered the most luxurious marble and granite.

Diar 203A
Last updated : 2022-10-30
Region : New Cairo
Project Status : Current Project

Facilities

Insulation Insulation
Entrance Entrance
Elevator Elevator
Garage Garage
Aluminum isolation Aluminum isolation
Central Satellite Central Satellite
Conditioner Bracket Conditioner Bracket
Connection Feed & Drain Connection Feed & Drain
Storage Room Storage Room
Electronic gate Electronic gate
Visual Intercom Visual Intercom
CCTV System CCTV System
Show More

True Copy - Lotus 42

05 April 2020

The video shows some construction stages and the extent of accuracy in implementation and unique,fashionable frontage using Mica stone and weather and dust resistant paintings.

Share Url

More Videos