Diar 120A

The project consists of a garage,ground floor and 3 floors,it has luxurious entrances made from marble and granite.for more security it has a complete security system containing security services,security camera and electronic garage.

Diar 120A
Last updated : 2022-08-24
Region : New Cairo
Project Status : Current Project

Location

The project is characterized by its proximity to the Youssef El Sebaei axis and its direct relationship with the main axes, which facilitates access to it and its proximity to the service area within the neighborhood, as well as its proximity to the eastern market in Rehab

Diar 120A

Facilities

Insulation

Insulation

Entrance

Entrance

Elevator

Elevator

Garage

Garage

Aluminum isolation

Aluminum isolation

Central Satellite

Central Satellite

Conditioner Bracket

Conditioner Bracket

Connection Feed & Drain

Connection Feed & Drain

Storage Room

Storage Room

Electronic gate

Electronic gate

Visual Intercom

Visual Intercom

CCTV System

CCTV System

Design

The interior design is characterized by utilizing the spaces so that the minimum no. of rooms is 3 rooms in addition to living room.

Units

Share Url

Contact Us

✓ Correct Number
Invalid number